- Home
- ยป
- Our Products
- »
- PULLEY
PULLEY
FRAME MADE OF STEEL | |||||
PROVIDED WITH SHANK/EYE HOOK AS PER REQUIREMENT | |||||
FORGED SWIVEL HOOK AS PER IS 8610 | |||||
PULLEY MOUNTED ON DOUBLE BALL BEARING | |||||
WHEEL MADE OF SGCI | |||||
RUST FREE ENAMEL PAINTED/GALVANISED |
Four Sheave Pulley
Minimum Order Quantity: 10 Unit
Material | IRON |
Max Capacity | 20 MT |
Number Of Sheave | 4 |
Number Of Grooves | Multi-Groove |
Brand | AMAR |
Application | Industrial |
No. of Sheave | Four |
for use in transmission line stringing tools , foundation work , tower erection work for different lines for 220 kv to 800 kv
Additional Information:
- Production Capacity: 100
- Delivery Time: 5 DAYS
Open Type Single Sheave Pulley
Minimum Order Quantity: 10 Unit
Material | IRON |
Max Capacity | 2-20 MT |
Number Of Sheave | 1 |
Capacity | Upto 20 ton |
Type | Open |
Use | Lifting |
for use in transmission line stringing tools , foundation work , tower erection work for different lines for 220 kv to 800 kv
Additional Information:
- Production Capacity: 100
- Delivery Time: 5 DAYS
- Packaging Details: BOX/CRATE
Close Type Single Sheave Pulley
Minimum Order Quantity: 10 Unit
Material | IRON |
Max Capacity | 1-20 MT |
Number Of Sheave | 1 |
Capacity | 2 ton |
Use | Lifting |
Type | Close |
No. of Sheave | Single |
for use in transmission line stringing tools , foundation work , tower erection work for different lines for 220 kv to 800 kv
Additional Information:
- Production Capacity: 100
- Delivery Time: 5 DAYS
Double Sheave Pulley
Minimum Order Quantity: 10 Unit
Capacity | 5 TON |
Type | Manual |
Application | Industrial |
Brand | AMAR |
No. of Sheave | Double |
for use in transmission line stringing tools , foundation work , tower erection work for different lines for 220 kv to 800 kv
Additional Information:
- Production Capacity: 100
- Delivery Time: 5 DAYS
- Packaging Details: BOX/CRATE
Equalizer Pulley
Minimum Order Quantity: 10 Unit
Type | Manual |
Material | IRON |
Number Of Grooves | Single Groove |
Max Capacity | 15 MT |
Number Of Sheave | 1 |
Brand | AMAR |
Capacity | 15 TON |
for use in transmission line stringing tools , foundation work , tower erection work for different lines for 220 kv to 800 kv
Additional Information:
- Production Capacity: 100
- Delivery Time: 5 DAYS
- Packaging Details: BOX/CRATE